The Midland School

427.170 kW

System Size

427.170 kW

Annual Output

427.170 kW

% of Energy Usage Covered

Challenge

The Midland School, a leading institution for students with special needs, operates on a budget that must maximize every dollar, typical for non-profit educational properties. The challenge was to justify the installation of a solar energy system to the school’s board as well as to current and prospective families.

Solution

Geoscape Solar’s marketing team installed a monitor in the school’s lobby that continuously displays slides showcasing the school’s savings, energy production, and environmental impact. This ongoing message highlights The Midland School’s dedication to stretching its resources while maintaining a commitment to sustainability.

This project was developed by Jeff during his tenure as founder and head of business development at Geoscape Solar.

Environmental Impact

lbs. of Carbon Removed

427.170 kW

# Trees Planted

427.170 kW

# Miles Taken Off The Road

427.170 kW

LET’S CONNECT

Get a complimentary solar analysis for your property.

Scroll to Top

Start your sustainable journey with Elevated Energy.